LRTP 2007 Final Report
The Syracuse Metropolitan Transportation Area contains a complex, multi-modal transportation system, which must be maintained in a good state of repair to preserve the infrastructure, improve safety, provide system connectivity, improve mobility, increase access and support economic growth. As the federally designated Metropolitan Planning Organization (MPO), the Syracuse
Metropolitan Transportation Council (SMTC) is responsible for the preparation of long-range transportation plans and, in accordance with the Safe, Accountable, Flexible, Efficient Transportation Equity Act, a Legacy for Users (SAFETEA-LU) of 2005, must update their long-range transportation plans every three years. The SMTC has prepared the Long-Range Transportation Plan (LRTP)
2007 Update to examine and consider changes in trends and conditions, and to confirm the validity of the forecasts and assumptions used in the 1995, 1998, 2001
and 2004 LRTP Updates.
LRTP 2007 Update Document
[../_private/adobe2.htm]
Note: download times are based on a 56k modem.
|
|
Cover, Table of Contents and Acronyms;
Policy Committee Resolution and Executive Summary
437 kb: 1 minute, 2 seconds
Chapter 1: Introduction
773 kb: 1 minute, 49 seconds
Chapter 2: Goals and Objectives
4,964 kb: 11 minutes, 45 seconds
Chapter 3: Metropolitan Planning Area Updated Data and Trends
1,773 kb: 4 minutes, 12 seconds
Chapter 4: Changing Transportation Needs and Impacts
11,967 kb: 28 minutes, 21 seconds
Chapter 5: Safety Conditions and Infrastructure Maintenance
3,202 kb: 7 minutes, 35 seconds
Chapter 6: Mobility, Accessibility and Intermodal Transportation
558 kb: 1 minute, 19 seconds
Chapter 7: Air Quality and Conformity Determination
126 kb: 17 seconds
Chapter 8: Long-Term Outlook and the Financial Plan |
Appendix A: Public Involvement Plan
Appendix B: Public Involvement Plan Supporting Documents
652 kb: 1 minute, 32 seconds
Appendix C: Discussion on Sprawl
Appendix D: Conformity Analysis
Appendix E: Greenhouse Gas and Energy Plan Process
Appendix F: References
Appendix G:
Transportation Services for Senior Facilities
Appendix H: Onondaga County Settlement Plan Transportation Policies
218 kb: 30 seconds
Appendix
I: SAFETEA-LU Action and Resolution
310 kb: 44 seconds
|
|