Syracuse Metropolitan Transportation Council (click for Home)
 

Home
Planning Process
LRTP
UPWP
TIP
Traffic Counts
Public Input
Employment
RFPs/RFQs
Meetings
Final Reports
Publications
Maps/GIS
Related Links
Site Index
Contact

This page last updated
February 17, 2008

Final Reports

The following Final Reports have been reviewed and approved by the SMTC Committee structure (Planning and Policy Committees), and are listed below by category and in chronological order, with the most recent reports presented first. (View SMTC Maps)

adobe acrobat logo identifying a pdf file Get Adobe Reader
Contact us to view a hard copy or if you cannot open any of these files.

Unified Planning Work Program (UPWP) Final Reports
(These links open in a new window.) Back to top

Cover of UPWP for fiscal years 2008-2010

You can view the UPWP for fiscal years 2008-2010. (This link opens in a new window.) For a bound copy please call the SMTC at (315) 422-5716 or e-mail your request.
( This file is 962 kb and will take approximately 2 minutes, 16 seconds to download on a 56k modem. )

 

Cover of 2007-2008 Adopted UPWP Ammendments

Unified Planning Work Program (UPWP) 2007–2008 Amendment

Adopted by the Policy Committee of the Syracuse Metropolitan Transportation Council March 12, 2007

1,710 kb; approx. download, 4 minutes, 3 seconds (56k modem).

 

Cover of UPWP for fiscal years 2006-2008

Unified Planning Work Program (UPWP) 2006–2008

2006-2008 Unified Planning Work Program for Transportation Planning in the Greater Syracuse Metropolitan area

Adopted by the Policy Committee of the Syracuse Metropolitan Transportation Council March 13, 2006

353 kb; approx. download,  50 seconds (56k modem).

 

UPWP for fiscal year 2003-2004

Unified Planning Work Program (UPWP) 2004–2006

2004-2006 Unified Planning Work Program for Transportation Planning in the Greater Syracuse Metropolitan area

Approved by the Policy Committee of the Syracuse Metropolitan Transportation Council, March 3, 2004

427 kb; approx. download, 1 minute (56k modem).

Amendments

253 kb; approx. download,  35 seconds (56k modem).

 

UPWP for fiscal year 2003-2004

Unified Planning Work Program (UPWP) 2003–2004

2003-2004 Unified Planning Work Program for Transportation Planning in the Greater Syracuse Metropolitan area

Approved by the Policy Committee of the Syracuse Metropolitan Transportation Council, March 5, 2003 

919 kb; approx. download, 2 minutes, 10 seconds (56k modem).

 

Unified Planning Work Program (UPWP) 2002–2003

2002-2003 Unified Planning Work Program for Transportation Planning in Syracuse and Onondaga County

Approved by the Policy Committee of the Syracuse Metropolitan Transportation Council, March 5, 2002 

1,067 kb; approx. download, 2 minutes, 31 seconds (56k modem).

 

Report Cover

Unified Planning Work Program (UPWP) 2001–2002

2001-2002 Unified Planning Work Program for Transportation Planning in Syracuse and Onondaga County

Approved by the Policy Committee of the Syracuse Metropolitan Transportation Council, March 22, 2001

933 kb; approx. download, 2 minutes, 12 seconds (56k modem).

 

Report Cover

Fiscal Year 2000–2001 Unified Planning Work Program

2000-2001 Unified Planning Work Program for Transportation Planning in Syracuse and Onondaga County

Approved by the Policy Committee of the Syracuse Metropolitan Transportation Council, March 7, 2000.

181 kb; approx. download,  25 seconds (56k modem).

 

South Side Transportation Study Final Report, October 1999

6,832 kb; approx. download, 16 minutes, 11 seconds (56k modem).

Transportation Improvement Plan (TIP) Final Reports
(These links open in a new window.) Back to top

Draft 2005-2010 TIP Cover   Adobe PDF logo (Adobe PDF) (This document opens in a new window.)
Noted file download times are based on a 56k modem.

View the 2007-2012 Transportation Improvement Program
4,239 kb: 10 minutes, 2 seconds

To accommodate those with older computer systems or dial-up modem connections, we have provided faster download alternatives (download time is approximate and is based on a 56k modem).

Title Page
Table of Contents
Resolution
Overview
Federal Highway Administration Project Listing
Federal Transit Administration Project Listing
Federal Highway Administration Project Listing By Fund Source
Federal Highway Administration and Federal Transit Administration Total Funds Obligated By Fund Source
City of Syracuse Capital Improvement Plan

705 kb: 1 minute, 40 seconds

New York State Department Of Transportation Capital Improvement Plan and New York State Thruway Authority Capital Improvement Plan 430 kb: 1 minute, 1 second

Onondaga County Capital Improvement Plan

Appendices 248 kb:  35 seconds

All figures 2,652 kb: 6 minutes, 16 seconds

Figure 1: SMTC MPA 194 kb:  27 seconds

Figure 2: Road Projects, SMTC MPA 1,074 kb: 2 minutes, 32 seconds

Figure 3: Road Projects, City of Syracuse 192 kb:  27 seconds

Figure 4: Isolated Projects, SMTC MPA 1,049 kb: 2 minutes, 29 seconds

Figure 5: Isolated Projects, City of Syracuse 185 kb:  26 seconds

Amended FHWA Projects as of 6/5/08
  Adobe PDF logo (Adobe PDF) (These documents open in a new window.)

 

Draft 2005-2010 TIP Cover

View the 2005-2010 Transportation Improvement Program

4,762 kb: 11 minutes, 16 seconds

Amended FHWA Projects as of 6/11/07
  Adobe PDF logo (Adobe PDF) (These documents open in a new window.)

 

2003-2206 TIP Cover

2003–2006 Transportation Improvement Program (TIP)

1,953 kb; approx. download, 4 minutes, 37 seconds (56k modem).

Amended FHWA Projects as of 4/11/05
Amended FTA Projects as of 3/14/05
  Adobe PDF logo (Adobe PDF) (These documents open in a new window.)

 

Report Cover

2001–2006 Transportation Improvement Program (TIP)

907 kb; approx. download, 2 minutes, 8 seconds (56k modem).

Amended FHWA
(Projects as of 12/10/02)


Amended FTA
(Projects as of 1/14/03)
  Adobe PDF logo (Adobe PDF) (These documents open in a new window.)

Long Range Transportation Plan (LRTP) Final Reports
(These links open in a new window.) Back to top

LRTP 2004 Update Cover

Long-Range Transportation Plan—2007 Update

 

LRTP 2004 Update Cover

Long-Range Transportation Plan—2004 Update

 

LRTP 2001 Update Cover

Long-Range Transportation Plan—2001 Update

Congestion Management System (CMS) Final Reports
(These links open in a new window.) Back to top

2004-2005 CMS Final Report Cover   Adobe PDF logo (Adobe PDF) (This document opens in a new window.)

Congestion Management System (CMS) Final Report 2004–2005
3,017 kb; approx. download, 7 minutes, 8 seconds (56k modem).

To accommodate those with older computer systems or dial-up modem connections, we have provided faster download alternatives (download time is approximate and is based on a 56k modem).

Report without figures 314 kb:  44 seconds

Figure 1 485 kb: 1 minute, 8 seconds

Figure 2 415 kb:  58 seconds

Figure 3 411 kb:  58 seconds

Figure 4 427 kb: 1 minute

Figure 5 412 kb:  58 seconds

Figure 6 406 kb:  57 seconds

Figure 7 406 kb:  57 seconds

Congestion Management System (CMS) 2001–2002

6,398 kb: 15 minutes, 9 seconds

University Hill Study Final Report
(These links open in a new window.) Back to top

Cover of University Hill Final Report
  1. Pedestrian   Bicyclist Issues   Needs Assessment Low Res 2,880 kb: 6 minutes, 49 seconds  
    High Res 3,576 kb: 8 minutes, 28 seconds
  2. Case Studies Report Low Res 1,047 kb: 2 minutes, 28 seconds High Res 1,140 kb: 2 minutes, 41 seconds
  3. Land Use   Transportation...ity Hill, Memo to the IFG Low Res 5,369 kb: 12 minutes, 43 seconds High Res 4,051 kb: 9 minutes, 35 seconds
  4. Land Use Concept, IFG Memo 2 Low Res 3,025 kb: 7 minutes, 9 seconds High Res 13,722 kb: 32 minutes, 30 seconds
  5. Needs Assessment Low Res 5,451 kb: 12 minutes, 54 seconds High Res 3,914 kb: 9 minutes, 16 seconds
  6. Emerging Concepts Low Res 2,602 kb: 6 minutes, 9 seconds High Res 8,372 kb: 19 minutes, 50 seconds
  7. Technical Memo Alternatives Modeling   Analysis Low Res 5,829 kb: 13 minutes, 48 seconds High Res 3,790 kb: 8 minutes, 58 seconds
  8. Technical Memo Alternatives Performance Matrix Low Res 1,251 kb: 2 minutes, 57 seconds High Res 1,570 kb: 3 minutes, 43 seconds
  9. Final Recommendations Low Res 2,680 kb: 6 minutes, 20 seconds High Res 4,297 kb: 10 minutes, 10 seconds
  10. Appendices to Final Recommendations Low Res 621 kb: 1 minute, 28 seconds High Res 674 kb: 1 minute, 35 seconds

Bicycle and Pedestrian Plan Final Report
(These links open in a new window.) Back to top

I-481 Final Report, December 2004

Bicycle and Pedestrian Plan Final Report, 2005

Bicycle Suitability Map

Intelligent Transportation Systems (ITS) Final Reports
(These links open in a new window.) Back to top

Intelligent Transportation System Strategic Plan Cover   Adobe PDF logo (Adobe PDF) (This document opens in a new window.)

Intelligent Transportation Systems Strategic Plan, 2003

Cover 439 kb: 1 minute, 2 seconds

Executive Summary 315 kb:  44 seconds

Concept Plan 7,404 kb: 17 minutes, 32 seconds

Regional Architecture 2,399 kb: 5 minutes, 41 seconds

Implementation Plan 7,224 kb: 17 minutes, 6 seconds

Environmental Justice (EJ) Final Report
(These links open in a new window.) Back to top

Cover, Environmental Justice Analysis Report, 2004-2006 UPWP

Environmental Justice Analysis Report, 2004-2006 UPWP

Full Report 23,018 kb; approx. download, 54 minutes, 31 seconds (56k modem).

Alternatives for faster download (note: download times are based on a 56k modem):

Full Report, without maps 266 kb:  37 seconds

Maps:
Map 1: SMTC MPO Area 647 kb: 1 minute, 31 seconds
Map 2: Minority Areas of Concentration 1,317 kb: 3 minutes, 7 seconds
Map 3: Low-Income Areas of Concentration 1,318 kb: 3 minutes, 7 seconds
Map 4: Senior Citizen Areas of Concentration 1,304 kb: 3 minutes, 5 seconds
Map 5: Disabled Areas of Concentration 656 kb: 1 minute, 33 seconds
Map 6: Low Population Areas 1,365 kb: 3 minutes, 14 seconds
Map 7: Target Areas 1,327 kb: 3 minutes, 8 seconds
Map 8: Centro Fixed Route Service 1,667 kb: 3 minutes, 56 seconds
Map 9: Senior Facilities and Centro Routes 1,506 kb: 3 minutes, 34 seconds
Map 10: OnTrack Rail Service 435 kb: 1 minute, 1 second
Map 11: Trail System 1,411 kb: 3 minutes, 20 seconds
Map 12: TIP Projects 1,361 kb: 3 minutes, 13 seconds
Map 13: UPWP Projects 1,492 kb: 3 minutes, 32 seconds
Map 14: UPWP Projects 1,522 kb: 3 minutes, 36 seconds
Map 15: Disabled Persons Transportation to Work: Vehicle 666 kb: 1 minute, 34 seconds
Map 16: Disabled Persons Transportation to Work: Bus 728 kb: 1 minute, 43 seconds
Map 17: Disabled Persons Transportation to Work: Bike or Walk 662 kb: 1 minute, 34 seconds
Map 18: Persons Below Poverty Transportation to Work: Vehicle 661 kb: 1 minute, 33 seconds
Map 19: Persons Below Poverty Transportation to Work: Bus 727 kb: 1 minute, 43 seconds
Map 20: Persons Below Poverty Transportation to Work: Bike or Walk 661 kb: 1 minute, 33 seconds
Map 21: Persons Below Poverty, No Vehicle Available 661 kb: 1 minute, 33 seconds
Map 22: Persons Below Poverty, Vehicle(s) Available 661 kb: 1 minute, 33 seconds

Planning & Corridor Studies
(These links open in a new window.) Back to top

Rt. 257 Final Report cover

Fayetteville-Manlius Road/Route 257 Pedestrian Accommodation Feasibility Study

Noted file download times are based on a 56k modem.

 

Federal Certification Review Final Report, 2005

1,878 kb; approx. download, 4 minutes, 26 seconds (56k modem).

 

I-481 Final Report, December 2004

I-481 Industrial Corridor Transportation Study Final Report, December 2004

7,719 kb; approx. download, 18 minutes, 17 seconds (56k modem).

 

Cover, Central New York Rail Corridor Inventory, 2003-2004 UPWP

Central New York Rail Corridor Inventory, 2003

725 kb; approx. download, 1 minute, 43 seconds (56k modem).

 

Break In Access Study: Soule Road Final Report 2003

2,294 kb; approx. download, 5 minutes, 26 seconds (56k modem).

 

Rail/Truck/ Transit Planning, 2002-2003 UPWP Summary Report

1,048 kb; approx. download, 2 minutes, 28 seconds (56k modem).

 

Federal Certification Review Final Report, 2002

5,566 kb; approx. download, 13 minutes, 11 seconds (56k modem).

 

Seneca Turnpike Corridor Traffic Study, 2001–2002 UPWP

1,728 kb; approx. download, 4 minutes, 5 seconds (56k modem).

 

Report Cover

James Street Corridor Traffic Study, 2000–2001 UPWP

2,084 kb; approx. download, 4 minutes, 56 seconds (56k modem).

 

Report Cover

Job Access and Reverse Commute Plan (JARC), 2000–2001 UPWP

12,230 kb; approx. download, 28 minutes, 58 seconds (56k modem).

 

Report Cover

South Salina Street Corridor Study, 2000–2001 UPWP

2,132 kb; approx. download, 5 minutes, 3 seconds (56k modem).

 

Report Cover

Taft Road and Northern Blvd. Study, 2001

899 kb; approx. download, 2 minutes, 7 seconds (56k modem).

 

Transit Traffic Signal Preemption Program, 2000–2001 UPWP

This document is not available as a download --- please call the SMTC at (315) 422-5716 or e-mail to request a hard copy.

1999–2000 UPWP Final Reports
Back to top

These documents are not available as a download --- please call the SMTC at (315) 422-5716 or e-mail to request a hard copy.

  • 1999-2000 Unified Planning Work Program (UPWP)
  • 1999-2004 Transportation Improvement Program (TIP)
  • City of Syracuse Truck Route Study
  • Congestion Management System
  • Liverpool Area - Onondaga Lake Parkway Transportation Study
  • Skaneateles Traffic Study
  • University Hill - Special Events Traffic Study

 

 

Syracuse Metropolitan Transportation Council logo

© 2008,
Syracuse Metropolitan
Transportation Council
Home ] Planning Process ] LRTP ] UPWP ] TIP ] Traffic Counts ] Public Input ] Employment ] RFPs/RFQs ] Meetings ] [ Final Reports ] Publications ] Maps/GIS ] Related Links ] Site Index ] Contact ]


Syracuse Metropolitan Transportation Council (SMTC)
100 Clinton Square, 126 N. Salina Street, Suite 100, Syracuse NY 13202
phone: (315) 422-5716     fax: (315) 422-7753
Directions to the office (opens in a new window)
Questions on this website? Drop us an e-mail or contact a staff member