 |
Final Reports
The following Final Reports have been reviewed and approved by the SMTC Committee structure (Planning and Policy Committees), and are listed below by category and in chronological order, with the most recent reports presented first. (View SMTC Maps)
The SMTC fiscal year runs from April 1 to March
31.
Most of these files are in Acrobat PDF format and open in a new
window; noted download times are based on a 56k (dial-up) modem.
Get
Adobe Reader (free). Contact us to view a hard copy or if you cannot open any of these files.
Fiscal Year 2010
Fiscal Year 2009
-
Clay-Cicero Route 31 Transportation Study
-
Report only (no appendices)
13,784 kb: 32 minutes, 39 seconds
-
Appendix A
-
Appendix B
1,229 kb: 2 minutes, 54 seconds
-
Appendix C
1,215 kb: 2 minutes, 52 seconds
-
Appendix D
1,454 kb: 3 minutes, 26 seconds
-
Appendix E
-
Appendix F
19,532 kb: 46 minutes, 16 seconds
-
Appendix G
801 kb: 1 minute, 53 seconds
-
Appendix
H
529 kb: 1 minute, 15 seconds
-
Appendix
I
University
Hill Park & Ride Feasibility Study
- Low resolution/quicker download
- Higher resolution/slower download
University Hill Phase II Feasibility Study, September 2009
7,035 kb: 16 minutes, 39 seconds
Report Figures
1,144 kb: 2 minutes, 42 seconds
Appendix files are available on request.
Bridge and Pavement Condition Management
System September 2009
4,926 kb: 11 minutes, 40 seconds
- Liverpool Transportation Modeling Technical Memo, May
2009—Complete Report
9,614 kb: 22 minutes, 46 seconds
Carrier Site Access Transportation
Study—Complete Report
14,527 kb: 34 minutes, 24 seconds
- Report only (no appendices)
2,325 kb: 5 minutes, 30 seconds
- All appendices
12,497 kb: 29 minutes, 36 seconds
- Appendix A
287 kb: 40 seconds
- Appendix B
4,683 kb: 11 minutes, 5 seconds
- Appendix C
- Appendix D
4,861 kb: 11 minutes, 30 seconds
- Appendix E
550 kb: 1 minute, 18 seconds
- Appendix F
- Appendix G
2,249 kb: 5 minutes, 19 seconds
-
Downer
Street Corridor Study
Fiscal Year 2008
Fiscal Year 2007
Fiscal Year 2006
Unified Planning Work Program for Transportation Planning in the Greater
Syracuse Metropolitan area; adopted by the Policy Committee of the Syracuse Metropolitan
Transportation Council March 13, 2006
353 kb; approx. download, 50 seconds (56k modem).
Environmental
Justice Analysis Report, 2004-2006 UPWP
23,018 kb; approx. download, 54 minutes, 31 seconds (56k modem).
Alternatives for faster download (note: download times are
based on a 56k modem):
Full
Report, without maps
266 kb: 37 seconds
Maps:
- Map
1: SMTC MPO Area
647 kb: 1 minute, 31 seconds
- Map
2: Minority Areas of Concentration
1,317 kb: 3 minutes, 7 seconds
- Map
3: Low-Income Areas of Concentration
1,318 kb: 3 minutes, 7 seconds
- Map
4: Senior Citizen Areas of Concentration
1,304 kb: 3 minutes, 5 seconds
- Map
5: Disabled Areas of Concentration
656 kb: 1 minute, 33 seconds
- Map
6: Low Population Areas
1,365 kb: 3 minutes, 14 seconds
- Map
7: Target Areas
1,327 kb: 3 minutes, 8 seconds
- Map
8: Centro Fixed Route Service
1,667 kb: 3 minutes, 56 seconds
- Map
9: Senior Facilities and Centro Routes
1,506 kb: 3 minutes, 34 seconds
- Map
10: OnTrack Rail Service
435 kb: 1 minute, 1 second
- Map
11: Trail System
1,411 kb: 3 minutes, 20 seconds
- Map
12: TIP Projects
1,361 kb: 3 minutes, 13 seconds
- Map
13: UPWP Projects
1,492 kb: 3 minutes, 32 seconds
- Map
14: UPWP Projects
1,522 kb: 3 minutes, 36 seconds
- Map
15: Disabled Persons Transportation to Work: Vehicle
666 kb: 1 minute, 34 seconds
- Map
16: Disabled Persons Transportation to Work: Bus
728 kb: 1 minute, 43 seconds
- Map
17: Disabled Persons Transportation to Work: Bike or Walk
662 kb: 1 minute, 34 seconds
- Map
18: Persons Below Poverty Transportation to Work: Vehicle
661 kb: 1 minute, 33 seconds
- Map
19: Persons Below Poverty Transportation to Work: Bus
727 kb: 1 minute, 43 seconds
- Map
20: Persons Below Poverty Transportation to Work: Bike or Walk
661 kb: 1 minute, 33 seconds
- Map
21: Persons Below Poverty, No Vehicle Available
661 kb: 1 minute, 33 seconds
- Map
22: Persons Below Poverty, Vehicle(s) Available
661 kb: 1 minute, 33 seconds
Fiscal Year 2005
Fiscal Year 2004
Fiscal Year 2003
Unified
Planning Work Program (UPWP) 2003–2004
2003-2004 Unified Planning Work Program for Transportation Planning in
the Greater Syracuse Metropolitan area; approved by the Policy Committee of the Syracuse Metropolitan
Transportation Council, March 5, 2003
919 kb; approx. download, 2 minutes, 10 seconds (56k modem).
2003–2006
Transportation Improvement Program (TIP)
1,953 kb; approx. download, 4 minutes, 37 seconds (56k modem).
Intelligent Transportation Systems Strategic Plan, 2003
Central
New York Rail Corridor Inventory, 2003
725 kb; approx. download, 1 minute, 43 seconds (56k modem).
Break
In Access Study: Soule Road Final Report 2003
2,294 kb; approx. download, 5 minutes, 26 seconds (56k modem).
Rail/Truck/
Transit Planning, 2002-2003 UPWP Summary Report
1,048 kb; approx. download, 2 minutes, 28 seconds (56k modem).
Fiscal Year 2002
Unified
Planning Work Program (UPWP) 2002–2003
1,067 kb; approx. download, 2 minutes, 31 seconds (56k modem).
2002-2003 Unified Planning Work Program for Transportation Planning in
Syracuse and Onondaga County; approved by the Policy Committee of the Syracuse Metropolitan
Transportation Council, March 5, 2002
Congestion
Management System (CMS) 2001–2002
6,398 kb: 15 minutes, 9 seconds
Federal
Certification Review Final Report, 2002
5,566 kb; approx. download, 13 minutes, 11 seconds (56k modem).
Seneca
Turnpike Corridor Traffic Study, 2001–2002 UPWP
1,728 kb; approx. download, 4 minutes, 5 seconds (56k modem).
Fiscal Year 2001
Unified
Planning Work Program (UPWP) 2001–2002
2001-2002 Unified Planning Work Program for Transportation Planning in
Syracuse and Onondaga County, approved by the Policy Committee of the Syracuse Metropolitan
Transportation Council, March 22, 2001
933 kb; approx. download, 2 minutes, 12 seconds (56k modem).
2001–2006
Transportation Improvement Program (TIP)
907 kb; approx. download, 2 minutes, 8 seconds (56k modem).
Long-Range
Transportation Plan—2001 Update
James
Street Corridor Traffic Study, 2000–2001 UPWP
2,084 kb; approx. download, 4 minutes, 56 seconds (56k modem).
Job
Access and Reverse Commute Plan (JARC), 2000–2001 UPWP
12,230 kb; approx. download, 28 minutes, 58 seconds (56k modem).
South
Salina Street Corridor Study, 2000–2001 UPWP
2,132 kb; approx. download, 5 minutes, 3 seconds (56k modem).
Taft
Road and Northern Blvd. Study, 2001
899 kb; approx. download, 2 minutes, 7 seconds (56k modem).
- Transit Traffic Signal Preemption Program, 2000–2001
UPWP
This document is not available as a download --- please call the SMTC at (315) 422-5716 or e-mail to request a hard copy.
Fiscal Year 2000
Fiscal Years 1999 and Before
These documents are not available as a download --- please call the SMTC at (315) 422-5716 or e-mail to request a hard copy.
-
- 1999-2000 Unified Planning Work Program (UPWP)
- 1999-2004 Transportation Improvement Program (TIP)
- City of Syracuse Truck Route Study
- Congestion Management System
- Liverpool Area - Onondaga Lake Parkway Transportation Study
- Skaneateles Traffic Study
- University Hill - Special Events Traffic Study
|
 |